Spring 2012 Update

The details of the Tolworth Greenway Project were approved for implementation by the Council’s Scrutiny Panel on Thursday 16 February, following the decision of  Surbiton Neighbourhood Committee to 'call in' the scheme on 15 December.

The 'call in' procedure is part of the Council’s democratic process to ensure transparency and examination of decision making.  The Scrutiny Panel meeting lasted over four hours and the outcome of the majority is to raise no objection.

This unexpected process has resulted in a delay to the programmed start date of the construction works.  As the Mayor for London has imposed a ban on all planned roadworks on the main road network during the Olympics, there is insufficient time to carry out the works before July.   In addition to this, Tolworth Broadway is an important district centre and it is Council policy to avoid works in the lead up to Christmas in such shopping areas.  This means that there is not enough time between the Olympics and the Christmas cut-off to carry out the works in one visit.  As there are cost implications to stopping the works to return and complete construction later,  the main contractor will not now start until early 2013.

There are opportunities to carry out some parts of the project before the main works start and the Council are discussing the most appropriate way forward with Transport for London and other partners.

Transport for London have confirmed that the funding of the scheme is not affected by this delay in the project

Background

Tolworth Broadway is set for an exciting new look and feel that puts pedestrians and shoppers at its centre. Particular attention is being paid to improving Tolworth Broadway as a high street and to balancing the priority between pedestrians, cyclists, and vehicular traffic by creating a more inviting and friendly environment and reducing traffic speeds.  

Kingston Council in partnership with Transport for London (TfL) is in the process of finalising detailed plans for the transformation of the area. The “Greenway” project, part of the Mayor’s Great Outdoors initiative, will deliver extensive public space improvements and address the key issues identified through previous consultation with the local community over the last few years. The project aims to revitalise the Broadway to become a thriving place for people to enjoy and use, safely and securely.

After two years of planning and consultation with residents and local groups, Transport for London (TfL) has pledged £1.6 million to build the scheme, with an additional £1 million coming from Kingston Council.  'Tolworth Times' newsletters have been distributed to residents and businesses in the wider Tolworth area to inform and update them about the scheme.  These can be seen at the bottom of this page.

The Greenway scheme will stretch along Tolworth Broadway from the junction with Ewell Road, across the A3 roundabout to Kingston Road, outside the Charrington Bowl.  

A series of exhibitions were held throughout November 2011, allowing people to find out more about the scheme.  The plans were approved at a meeting of the South of the Borough and Surbiton Neighbourhood Committees on 15 December.

Tolworth Greenway

The main aims of the scheme are to:

•Strengthen the vitality of the Broadway so that it becomes a place people want to use and spend time in

•Reduce the barriers to walking and cycling and improve road safety through a reduction in general traffic speeds to 20mph along the Broadway

•Improve access to Tolworth Station and Tolworth Broadway

•Improve the general environment and feeling of  safety

•Enhance the public space and improve links to community facilities such as schools, green spaces, shops and recreational opportunities

The plan is to remove the central barriers along Tolworth Broadway to allow pedestrians to cross the road at any point they choose. Formal pedestrian crossing points, both signalled and unsignalled, will be provided for those who wish to use them.

The central island (the ‘Greenway’) will be widened, have a low kerb and a vibrant resin bound gravel surface that will enable all users to travel safely from Ewell Road and Kingston Road.  The Royal National Institute of Blind People, various interest groups, and the police have advised on the design to make sure it is suitable for everyone. The existing traffic signals at Tolworth Roundabout will be adjusted to allow the road to be crossed by pedestrians and cyclists so bypassing the subways which many people said they found intimidating.

The footways outside the shops on Tolworth Broadway will also be re-laid using concrete blocks to form a forecourt effect.

New paths will be provided within the roundabout to link the new crossing points with the existing pedestrian bridge over the A3. The bridge will be modified to allow cyclists to safely ride across it. A new signal controlled crossing will be provided in Kingston Road to allow access to both the Charrington Bowl and the Sunray Estate sides of the road.

The plans will be presented for approval to a special meeting of the Surbiton and South of the Borough Neighbourhood Committees on Thursday 15 December at Dysart School, Ewell Road, Tolworth. This is a public meeting and everyone is welcome to attend.

It is anticipated that the work will start in April 2012, following a tender process to appoint a Contractor. The aim is to complete the works before the start of the London Olympics in the summer.

Discussions will be held with residents and retailers to try to minimise the disruption during the construction period.

More detail about the Project

Further aspects of the Project include:

Speed Limits – The speed limit on Tolworth Broadway will be reduced to 20 mph, making it safer for pedestrians when crossing at any point;

Trees – there will be a number of additional trees planted both in the footway in front of the shops and on the central island;

Seating – extra benches will be provided in front of the shops. There will be no seating on the central island;

Cycles – The scheme provides a safe route for cyclist to cross the A3. Cyclists will also be able to use the central island and the roadway as at present. The aim is to encourage more shoppers and commuters to cycle, reduce car journeys and lower emissions;

Street lighting – new lamp columns will be installed to increase the levels of lighting in the Broadway and the centre of the roundabout. Extra lights will be installed to make sure the footways in front of shops are well lit;

Deliveries – loading bays will be provided on both sides of Tolworth Broadway;

Pedestrian Crossings – controlled crossing (with a green man) will be installed at either end of Tolworth Broadway with 3 uncontrolled crossing (no green man) in between;

Pedestrian Subways - The existing subways will still be available to use;

On-street Parking - The number of on-street parking spaces will not change;

Buses - Bus services will remain the same.

Aerial shot of proposed developments to Tolworth rounabout and Broadway

Further Information

If you have any questions about the Tolworth Project please contact us by email: tolworth.project@rbk.kingston.gov.uk

 
Search the Site

The Royal Borough of Kingston upon Thames, Guildhall, High Street, Kingston upon Thames, KT1 1EU

Contact Us | SMS: 07797 806 521
Emergency Out of Hours: 020 8547 5800