(As per information given by the activities promoters)
From Mount Road to Jubilee Way.
The works to lay two High Voltage electricity cables to supply a new business have now been completed. The Council is arranging to have the carriageway entirely resurfaced although the date is still to be confirmed.
Between Latchmere Road and Kings Road.
Southern Gas Networks are relaying services in the footway from 8 May until 30 June 2012 using pedestrian walkways in the cycle lane of the carriageway.
Road closed due to engineering difficulties in the Richmond Road works. Local diversion in place for resdents' access.
The Council's contractors are carrying out footway works and kerb line alterations from 10 April 2012 for 7 weeks. Use of temporary traffic signals wll be necessary at times.
Transport for London is carrying out carriageway re-surfacing works at night 21:00 until 05:00 commencing 17 May 2012 for 11 nights under a road closure with diversions. The outer lanes of the roundabout and lane 1 on all approaches will also be closed.
Severe disruption expected!
During the closure:
For more information on how these works will affect public transport please see:
Outside 33.
Thames Water working on a sewer manhole using traffic signals from 30 May for 3 days.
The Council's contractors will work from 21:00 until 06:00 hours at the junctions of Coombe Road and from junctions with Queen Elizabeth Road and Albert Road from 21 May until 24 May 2012.
Councl's contractors are carrying out footway widening and entry treatment works from 21 May 2012 for 10 days. A road closure will be in place.
Outside 100.
Thames Water will undertake a sewer connection using traffic signals on 21 May 2012 for 10 days.
Railway bridge.
Detailed examination of the rail bridge over the road on 23 May 2012 for 2 days between the hours of 22:00 until 02:00. Temporary 2 way lights wil be used.
Outside 34 - 36.
Temporary 2 - way lights will be used on 23 May 2012 to enable a crane operation to take place to deliver concrete blocks to a new development ( 1st of 3 ). Off peak only.
Between Montem Road and Stratford Court.
Council's contractors will be undertaking carriageway resurfacing works from 21 May 2012 for 5 nights between 20:00 and 05:00 hours. Temporary traffic lights will be used.