Skip to main content | Access Keys | Site Map
The Royal Borough of Kingston upon Thames homepage
The Royal Borough of Kingston upon Thames homepage

 

Waste Plan Stage 5: Adoption

The South London Waste Plan, as amended by the binding Inspector’s Report, was adopted by the Council on 24 January 2012.

Following adoption, there is a six-week legal challenge period. Since Sutton was the last borough to adopt, on 5 March, the legal challenge period runs from 6 March to 17 April. Details of possible grounds for a legal challenge are given in the Adoption Statement (see below).

The South London Waste Plan is one of two Development Plan Documents within the Kingston Local Development Framework. It is in conformity with the Core Strategy, which is due to be adopted on 17 April.

Related External Links:

 
Search the Site

The Royal Borough of Kingston upon Thames, Guildhall, High Street, Kingston upon Thames, KT1 1EU

Contact Us | SMS: 07797 806 521
Emergency Out of Hours: 020 8547 5800