Expansion proposals were consulted on an area basis from 15 March - 10 May 2010 for Kingston Town and Surbiton areas and between 19 April- 1 June 2010 for Maldens and Coombe and South of the Borough areas.
A report outlining the results of the consultations in Kingston Town and Surbiton areas was considered by Kingston's Executive on 8 June 2010. This report can be accessed from the following link:
Documents from the Kingston Town and Surbiton area consultation:
A report outlining the results of the consultations in Maldens and Coombe and South of the Borough areas will be considered by Kingston's Executive on 30 June 2010 (link above).
Documents from the Maldens and Coombe and South of the Borough area consultation: